How a Regional Bank Saved Millions on a UPS Upgrade with Critical Labs

When a large regional bank acquired another institution in a different region, they faced a critical infrastructure challenge: How do you support a full network refresh when you have no visibility into the existing power systems?

The Challenge

An Unclear Power Landscape and a Disconnected UPS Fleet

After acquiring a bank in another region, the IT and facilities teams at the regional bank were tasked with modernizing and integrating the two networks. A full network refresh was on the roadmap, but there was a serious blind spot: no clear information existed about the new region’s current power infrastructure.

 

Key Obstacles:

The Solution

Deep Discovery and Data-Driven Capacity Reporting

To address the complexity and uncertainty of the newly acquired infrastructure, the bank turned to Critical Labs for a comprehensive solution that combined discovery, data collection, and actionable insights. With Critical Labs’ tools and services, the team was able to quickly assess the existing environment and determine the best path forward without wasting time or money.

 

Using our platform, they were able to:

The Results

Standardization, Savings, and Scalable Power

A data-informed strategy led to major cost savings and long-term operational efficiency.

 

The outcome was a game-changer. Rather than proceeding blindly with an expensive replacement plan, the bank:

Take control of what's critical.

Whether you’re ready to optimize your infrastructure or explore a strategic partnership, we’re here to help you move forward with confidence.